Anzeige der Ergebnisse 191 bis 200 von 593
31/10/2018
Sale and purchase brokers concluded an MOA. Shortly afterwards a mooring line was caught in the ship’s propeller and the ship could not make the laycan in the MOA. The ship was dry docked for repairs. Buyers and...
24/04/2018
A liner agent was responsible for cargo booking, ship handling and the completion of documentation on behalf of their principal. On six separate occasions during a three month period the cargo manifest had been incomplete on the line’s system.
Port agents in Hong Kong represented a container ship calling at Kwai Chung Container Terminal. Once discharge and loading operations were completed the ship sailed for her next port, Shanghai. During the call a service engineer had disembarked to return to his home town.
A port agent was nominated by the charterers in respect of the loading of a cargo at an Australian port.
A maritime engineering consultant was engaged on a Boil-Off Gas (commonly referred to as “BOG”) Compressor Project. Their involvement included the design of the oil lube pump piping in the compressors. They prepared construction drawings and the oil lube pump piping was built in accordance with those drawings.
A naval architect was appointed by the builders of an 8m hydrographic survey vessel to approve the vessel’s design and stability in accordance with prescribed standards.
A cargo recovery agent was engaged in relation to three containers of seeds that had arrived wet. The cargo had a total value of US$145,000.
A surveyor in Canada was contracted to provide a load and stow survey for a barge of steel.
A pool manager fixed a ship on the basis that it could transit the new Panama Canal. The ships in that fleet were all of a size to be able to transit the canal and the pool manager believed that all the ships were equipped appropriately for Panama Canal transit.
A naval architect was asked to provide plans for modifications to a section of a racing yacht which was under construction. When providing the plans, they misstated the amount of carbon fibre tissue that was required to provide greater strength in the hull by stating that 400g was required instead of 600g. While this was not held to have led to any critical weakness within the hull, the owners decided to reinforce the hull by adding the missing carbon fibre during the winter season.